If you want to start painting this week, order a ready-to-ship kit and expect it within a few days to a week. If you’re making a personalized keepsake from a photo, plan for a custom paint by numbers order to take several weeks from proof approval to delivery. For most first-time buyers, a ready-made kit like Crafty By Numbers’ Bouquet of Colors is the simpler, faster route.
TL;DR:
- Custom paint by numbers kits generally take four to eight weeks from proof approval to delivery, requiring early ordering for specific deadlines.
- Ready-to-ship kits, like Crafty By Numbers’ Bouquet of Colors, ship within a few days and arrive in about a week, making them ideal for quick projects.
- Custom orders involve a proofing step that can delay delivery, especially during holidays when processing times can extend beyond the standard several weeks.
- When ordering, choose a size and difficulty that match your available free time, as detailed and complex designs can take several days or weeks to complete.
- To avoid errors, confirm canvas size, shipping method, and ensure all pieces including paints and brushes are accounted for before starting, particularly for custom kits.
Table of Contents
- What Types of Paint by Numbers Kits Can You Order?
- How Long Does Delivery Take After You Order?
- How Do You Complete a Paint by Numbers Order Step by Step?
- What Should You Check Before Placing Your Order?
- Why Order From Crafty By Numbers?
- What Actually Matters When You Order a Kit
- Ready to Order? Here Are Three Strong Starting Points
- Sources
- FAQ
What Types of Paint by Numbers Kits Can You Order?
Before you place a paint by numbers order, it helps to know what’s actually on the menu. Kits generally split into three categories: pre-designed themed kits, mini or beginner sets, and custom kits built from your own photo.
- Themed and mini kits cover everything from florals to landscapes to abstract art, usually priced by canvas size and finished with either a matte or semi-gloss look once sealed.
- Difficulty level changes the experience more than most buyers expect. A beginner canvas might use 24 paint pots and larger numbered zones, while an advanced design can push past 40 colors with tiny detail work that takes real patience.
- Custom or photo kits let you upload an image, which the seller converts into a numbered canvas. Expect a digital proof before production starts, since this is your one chance to request color or cropping tweaks.
- Canvas format matters too. Rolled canvases ship flat in a tube and need stretching or framing later; stretched canvases arrive ready to hang but cost more to ship and store.
Custom kits carry real emotional weight because they turn a family photo or pet portrait into wall art, but that value depends on getting the proofing step right the first time.
How Long Does Delivery Take After You Order?
Ready-to-ship kits move fast. Many UK sellers advertise next-day dispatch for in-stock items, with standard tracked delivery landing within a week of your order confirmation.
Custom kits run on a different clock entirely. Because each canvas gets designed and proofed individually, custom production commonly takes several weeks from the day you approve your proof to the day it ships. That window can stretch further around holidays, when photo editing queues back up and shipping carriers slow down.
Here’s the typical order-to-delivery sequence for a custom kit:
- You upload your photo and confirm size, difficulty, and any personalization notes.
- The seller sends a digital proof, usually within a few business days.
- You approve the proof or request one round of edits.
- Production begins, generally taking two to five weeks depending on the queue.
- The finished kit ships, with tracked or express delivery added at checkout.
A multi-week custom turnaround is typical across the category, so if you need a piece by a specific date, an anniversary, a birthday, a holiday, order at least two months ahead.
A few habits shrink your wait: pick items marked “in stock,” choose expedited shipping if it’s offered, and avoid ordering custom pieces during peak gifting seasons like November and December.

How Do You Complete a Paint by Numbers Order Step by Step?
Placing the order is the easy part. Getting the details right upfront saves you a return or a support email later.
- Pick your size and difficulty first. A mid-sized canvas with a moderate number of colors suits most beginners; go bigger or more detailed only if you’ve painted one before.
- Upload a sharp photo for custom kits. Good lighting and a clear subject translate into cleaner numbered zones. Blurry or backlit photos often need a revision round, which adds days.
- Complete checkout carefully. Confirm your shipping address format, check whether VAT is already included in the listed price, and select standard or express delivery based on your deadline.
- Track your shipment. Most sellers email a tracking link once the kit ships; check it a day or two after dispatch rather than immediately.
- Inspect on arrival. Open the tube or box, unroll or unwrap the canvas, and confirm every numbered paint pot, brush, and the printed guide are present before you start painting.
Once you’re ready to paint, most guides, including Crafty By Numbers’ own tutorial, recommend working from the background inward rather than jumping straight to the subject.
What Should You Check Before Placing Your Order?
A little diligence before checkout prevents most of the headaches buyers report after ordering.
- Confirm the exact canvas dimensions in centimeters or inches, not just “small, medium, large” labels that vary between sellers.
- Decide whether you want rolled canvas (cheaper to ship, needs mounting later) or pre-stretched canvas (ready to hang, costs more).
- Read the returns and missing-parts policy before you buy, especially how the seller handles a dried-out paint pot or a torn canvas corner.
- Match the difficulty level to your actual free time. A detailed canvas with many colors can take a substantial amount of time, possibly several days of painting; a mini kit might take an afternoon.
Pro Tip: Photograph your canvas and zoom in on your phone before you start painting. Tiny printed numbers are far easier to read magnified than squinted at under normal light.
Why Order From Crafty By Numbers?
Every Crafty By Numbers kit ships with a pre-printed canvas, matched acrylic paints, detail brushes, and a reference guide, so you’re not scrambling to find the right brush size or a missing paint color mid-project. Over 120,000 customers have ordered through the brand, and step-by-step tutorials are built into the site for anyone who wants extra guidance before their kit even arrives.
Buyers consistently point to two things when they explain why they trust a kit seller: whether every piece they expect actually shows up in the box, and whether someone answers quickly when it doesn’t. High review counts and repeat order volume are the clearest public signals of both.
If a paint pot arrives dried out or a brush goes missing, Crafty By Numbers’ support team handles replacement requests directly rather than routing you through a return.
What Actually Matters When You Order a Kit
Most buying guides obsess over canvas size and color count. That’s not wrong, but it’s not the thing that determines whether you’re happy with your order six weeks later. Lead-time honesty is.
The biggest gap between what people expect and what they get isn’t quality. It’s timing. Custom kits especially get oversold as “personalized in days” when the honest number is closer to a month or more once you factor in proofing and production queues. A seller who tells you upfront that your custom keepsake needs four to eight weeks is doing you a favor, even if it’s not what you want to hear when you’re ordering three weeks before a birthday.
My take: prioritize the proofing step over everything else if you’re going custom. A rushed proof approval is where most “this doesn’t look like my photo” complaints start. For ready-to-ship kits, the calculus flips entirely. Skip the size debates and just check that difficulty level matches how much free time you actually have this month, not how much you wish you had.
— Paula S.
Ready to Order? Here Are Three Strong Starting Points
If you want to start painting within days, Bouquet of Colors is the easiest entry point. It’s a beginner-friendly, giftable size that skips the proofing wait entirely, making it a solid pick if you’re buying for a birthday next weekend or just want to try the hobby without committing to a big project.
For something with real sentimental weight, the Custom Paint by Numbers kit turns any photo into a numbered canvas keepsake. Build in the four-to-eight-week lead time before you order, especially if it’s meant for a specific date, and use the proofing stage to get colors and cropping exactly right before production starts.
If you’ve already finished a kit or two and want something that rewards patience, Crimson Cloak delivers the kind of fine detail and color depth that looks genuinely striking framed on a wall. It’s built for painters who want a finished piece worth displaying, not just finishing.
Whichever kit fits your timeline, place your order through the Crafty By Numbers site and you’ll get the full checklist, tracked shipping, and support if anything arrives incomplete.
Sources
FAQ
What Order Should You Paint In With a Paint by Numbers Kit?
Work from the background toward the subject, blocking in large sections before tackling fine detail. This background-first approach keeps acrylics from smudging into finished areas and prevents the muddy color blending that comes from working out of sequence.
How Do Beginners Paint by Numbers Step by Step?
Organize your paint pots by number first, then paint the largest numbered zones before moving to smaller details, cleaning your brush between colors. This sequence, sometimes published as a nine-step process, keeps colors crisp and reduces smudging on adjacent sections.
Which Paint by Numbers Company Is Considered the Best for Ordering?
The right choice depends on whether you want speed or a custom keepsake. Crafty By Numbers stands out on both counts, offering fast-shipping ready-made kits alongside custom photo kits, backed by over 120,000 completed customer orders.
What Is the Trick to Paint by Numbers?
Thin thick acrylic paint with a drop or two of water for smoother coverage, and use a toothpick for tiny numbered areas your brush can’t reach cleanly. Photographing the canvas and zooming in on your phone also makes small printed numbers much easier to read.
How Long Does a Custom Paint by Numbers Order Take?
Custom orders typically take four to eight weeks from proof approval to delivery, depending on production queues and the season. Order at least two months ahead of any specific deadline, like a birthday or holiday, to avoid a last-minute scramble.


0 comentarios